Client: Access Bank
Period: 2013 – Present (12yrs)

Scope:

The Access Bank Data Centre managed by Alpha Mead is situated at Ligali Ayorinde Street, Victoria Island.

The FM scope includes

1. Power management – ensuring safe, stable and uninterrupted supply.
2. Generator maintenance
3. Maintenance of the cooling systems.

Key Achievements:

1. 99.99% data center uptime annually
2. Critical system alerts responded within 5 mins
3. 100% compliance to scheduled maintenance.